This project will replace D-Float and provide 58 new slips for 40’ long vessels. In addition to the main and stall floats, the project will replace the approach trestle, 80’ gangway ramp, potable water, dry standpipe fire suppression, shore power and lighting systems. The new floats utilize an innovative and cost-effective design using timber frame and deck with polyethylene flotation tubs that keep the timber out of the water. The floats will be equipped with seasonal potable water, dry standpipe fire suppression, shore power and lighting.