R&M provided general administration and observation of the construction activities for a $25 million expansion of the City’s Powerhouse. Major components included reinforced Portland Cement Concrete and engineered fill foundations, a two-bay 16,000 SF pre-engineered metal building, multiple mechanical and electrical support structures, integrated electrical and mechanical systems for two 5.1 Mega-Watt diesel fired generators, and one 4.4 Mega-Watt diesel fired generator to replace the existing generator systems. Starting with an incomplete design, R&M partnered with the Contractor, Owner and Designer to fill in the missing contract components to provide a very successful project.