R&M provided civil, bulk fuel, survey and environmental services. The civil scope included demolition of existing structures, decommissioning of sewage lagoon, placement of soil embankment on the building site, regrading of embankment under the existing building to remain, above ground water and sewer service connections, off-site bulk fuel storage with pipeline connection, and new site boardwalk connections.
R&M obtained ADEC and USACE permits for the sewage lagoon decommissioning and wetlands fill. We coordinated off-site water and sewer force main connections with the Kipnuk Village Washeteria. Boardwalk connections required design coordination with DOT&PF for the boardwalk being constructed around the school during the same construction period.